Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method has been removed. See news for more details.

Muon Department meeting

US/Central
Description
Stakeholders discuss the work and coordination needed for the various tasks of clear out and installation in and through the 30 straight section
Slides
    • 1
      Announcements
      Speaker: Jerry Annala (AD/Tevatron)
      Slides
    • 2
      Use of database for start up checks
      A new check system is being implemented by the Division to prevent start up mistakes. A new database will be an important part of this system. The Muon Campus will be the test case for this system.
      Speaker: Cons Gattuso (AD headquarters)
      Slides
    • 3
      M4 shield wall results
      Speaker: Anthony Leveling (Fermilab)
    • 4
      Non Project efforts required
      Speaker: Mr Brian Drendel (AD/HQ)
      Slides