Camille Ginsburg
(Fermilab), MICHAEL FOLEY
(FNAL/TD)
Description
We will review the technical specification and plan toward procurement of the niobium and other materials for LCLS-II SRF cavities. The reviewed topics shall include: drawing readiness, materials specifications, the QA/QC plan, cost estimates, the contingency plan, and the schedule. Technical and procurement experts have been invited to form a review team. The outcome of this review is a set of action items to lead us to the procurement readiness (gate) review prior to procurement.
Connection Info
Reviewers' Report
SLAC Review Procedure
13:00
→
13:10
Welcome and Logistics10m
Speaker:
Richard Stanek
(Fermilab)
13:10
→
13:20
Review Overview10m
Speaker:
Camille Ginsburg
(Fermilab)
Slides
13:20
→
13:40
Schedule20m
Speaker:
Marc Kaducak
(Fermilab)
13:40
→
14:10
Advance Acquisition Plan30m
Speaker:
Bob Cibic
(Fermilab)
14:10
→
14:40
Materials Specifications30m
Speaker:
DrLance Cooley
(Fermilab)
Slides
14:40
→
15:00
Fabrication Drawings20m
Speaker:
MICHAEL FOLEY
(FNAL/TD)
drawings
15:00
→
15:40
Request for Proposal40m
Speaker:
MICHAEL FOLEY
(FNAL/TD)
document
15:40
→
16:00
Coffee Break
20m
16:00
→
16:20
QA/QC plans20m
Speaker:
Camille Ginsburg
(Fermilab)
Slides
16:20
→
17:00
Review Team Discussion40m
Speaker:
Allan Rowe
(Fermilab)
17:00
→
17:20
Closeout20m
Speakers:
Allan Rowe
(Fermilab), Camille Ginsburg
(Fermilab)