Camille Ginsburg
(Fermilab), MICHAEL FOLEY
(FNAL/TD)
Description
We will review the technical specification and plan toward procurement of the niobium and other materials for LCLS-II SRF cavities. The reviewed topics shall include: drawing readiness, materials specifications, the QA/QC plan, cost estimates, the contingency plan, and the schedule. Technical and procurement experts have been invited to form a review team. The outcome of this review is a set of action items to lead us to the procurement readiness (gate) review prior to procurement.
Connection Info
Reviewers' Report
SLAC Review Procedure
1
Welcome and Logistics
Speaker:
Richard Stanek
(Fermilab)
2
Review Overview
Speaker:
Camille Ginsburg
(Fermilab)
Slides
3
Schedule
Speaker:
Marc Kaducak
(Fermilab)
4
Advance Acquisition Plan
Speaker:
Bob Cibic
(Fermilab)
5
Materials Specifications
Speaker:
DrLance Cooley
(Fermilab)
Slides
6
Fabrication Drawings
Speaker:
MICHAEL FOLEY
(FNAL/TD)
drawings
7
Request for Proposal
Speaker:
MICHAEL FOLEY
(FNAL/TD)
document
15:40
Coffee Break
8
QA/QC plans
Speaker:
Camille Ginsburg
(Fermilab)
Slides
9
Review Team Discussion
Speaker:
Allan Rowe
(Fermilab)
10
Closeout
Speakers:
Allan Rowe
(Fermilab), Camille Ginsburg
(Fermilab)