Please read these instructions before posting any event on Fermilab Indico

Indico will be down for maintenance on August 8th from 6-7PM

Niobium pre-procurement engineering peer review

US/Central
Hermitage (Industrial Center Building)

Hermitage

Industrial Center Building

ICB 2nd floor East
Camille Ginsburg (Fermilab), MICHAEL FOLEY (FNAL/TD)
Description
We will review the technical specification and plan toward procurement of the niobium and other materials for LCLS-II SRF cavities. The reviewed topics shall include: drawing readiness, materials specifications, the QA/QC plan, cost estimates, the contingency plan, and the schedule. Technical and procurement experts have been invited to form a review team. The outcome of this review is a set of action items to lead us to the procurement readiness (gate) review prior to procurement.
Connection Info
Reviewers' Report
SLAC Review Procedure
    • 1
      Welcome and Logistics
      Speaker: Richard Stanek (Fermilab)
    • 2
      Review Overview
      Speaker: Camille Ginsburg (Fermilab)
      Slides
    • 3
      Schedule
      Speaker: Marc Kaducak (Fermilab)
    • 4
      Advance Acquisition Plan
      Speaker: Bob Cibic (Fermilab)
    • 5
      Materials Specifications
      Speaker: Dr Lance Cooley (Fermilab)
      Slides
    • 6
      Fabrication Drawings
      Speaker: MICHAEL FOLEY (FNAL/TD)
      drawings
    • 7
      Request for Proposal
      Speaker: MICHAEL FOLEY (FNAL/TD)
      document
    • 15:40
      Coffee Break
    • 8
      QA/QC plans
      Speaker: Camille Ginsburg (Fermilab)
      Slides
    • 9
      Review Team Discussion
      Speaker: Allan Rowe (Fermilab)
    • 10
      Closeout
      Speakers: Allan Rowe (Fermilab), Camille Ginsburg (Fermilab)