Niobium pre-procurement engineering peer review

US/Central
Hermitage (Industrial Center Building)

Hermitage

Industrial Center Building

ICB 2nd floor East
Camille Ginsburg (Fermilab), MICHAEL FOLEY (FNAL/TD)
Description
We will review the technical specification and plan toward procurement of the niobium and other materials for LCLS-II SRF cavities. The reviewed topics shall include: drawing readiness, materials specifications, the QA/QC plan, cost estimates, the contingency plan, and the schedule. Technical and procurement experts have been invited to form a review team. The outcome of this review is a set of action items to lead us to the procurement readiness (gate) review prior to procurement.
Connection Info
Reviewers' Report
SLAC Review Procedure
    • 13:00 13:10
      Welcome and Logistics 10m
      Speaker: Richard Stanek (Fermilab)
    • 13:10 13:20
      Review Overview 10m
      Speaker: Camille Ginsburg (Fermilab)
      Slides
    • 13:20 13:40
      Schedule 20m
      Speaker: Marc Kaducak (Fermilab)
    • 13:40 14:10
      Advance Acquisition Plan 30m
      Speaker: Bob Cibic (Fermilab)
    • 14:10 14:40
      Materials Specifications 30m
      Speaker: Dr Lance Cooley (Fermilab)
      Slides
    • 14:40 15:00
      Fabrication Drawings 20m
      Speaker: MICHAEL FOLEY (FNAL/TD)
      drawings
    • 15:00 15:40
      Request for Proposal 40m
      Speaker: MICHAEL FOLEY (FNAL/TD)
      document
    • 15:40 16:00
      Coffee Break 20m
    • 16:00 16:20
      QA/QC plans 20m
      Speaker: Camille Ginsburg (Fermilab)
      Slides
    • 16:20 17:00
      Review Team Discussion 40m
      Speaker: Allan Rowe (Fermilab)
    • 17:00 17:20
      Closeout 20m
      Speakers: Allan Rowe (Fermilab), Camille Ginsburg (Fermilab)