AD Weekly Friday - 2017 Scheduling Meeting/Weekly Summary (16 Jun 2017)

Linac

  • Running OK.
  • Had a problem with a water skid yesterday that they are looking at in detail this morning.
Booster
  • Good week overall.
  • 4.5E12 to NuMi.
  • 1E12 to SY.
  • 22 minutes of downtime for the week, mostly misc RF.
  • Commissioning of the laser notcher continues on the $1D cycles and the system is working well.
  • Early capture studies and cogging code updates continue.
  • Requested studies before the shutdown are listed in the accompanying slides. Tan is studies coordinator.
Main Injector & Recycler
  • MI has had a smooth week.
  • Currently in access to repair water leaks on two RF cavities.
  • Ring wide rad survey is also being done this morning.
  • Requested studies before the shutdown are listed in the accompanying slides.
NuMI
  • Running well.
  • Currently looking for a water leak in the MI stub.
NuMI Experiments
  • Running well.
Booster Neutrino
  • Cooling water is getting warm along with the weather.
BNB Experiments
  • MicroBooNE has updated their trigger.
  • Prepared for WH power outage this weekend.
Muon Rings
  • Beam studies have been in progress.
  • M1 TLM studies will continue this afternoon.
  • Note that there is no access permitted to AP1.
  • Ran 8GeV mode to delivery ring and worked on orbit smoothing.
  • Plan to turn on in 3.1 GeV mode today.
Muon Experiments
  • Hope to be ready for S&S this afternoon.
MTA
  • Cleanup is underway. Access is restricted to the cleanup team.
SY120, Neutrino Muon, Meson Test, Meson Center
  • Lost clock to the M05 ESS Thursday but that was recovered quickly.
  • MCC5Q2 tripped.
SY120 Experiments
  • SeaQuest is taking beam when it's available.
  • LAriat is taking data.
  • Mtest has ORC for Ice Cube experiment and will take data this week.
FAST
  • FLuids group is investingating 300MeV line flow meter issues.
  • 3 50MeV quads are being skewed for flat beam transform operation.
  • CC1 and CC2 RF stations are being brought on line.
  • RF gun and CM2 stations will be brought on when RSO locks have been removed.
PIP-II Injector Test
  • Established beam through the LEBT and MEBT with high efficiencies.
  • Checking out new instrumentation.
  • Looking at getting permission to run at higher duty cycle.
  • Plan to shut down and install remaining quad triplets in mid-July.
Alignment
  • Supported LCLS2 installation.
  • Alignment support for Muon campus.
Controls
  • Addressed problems with the FSEPS motion controls.
  • Replaced Booster MADC #4.
Cryo
  • MTA is running well at 4K.
  • CMTF is running well and is in cooldown mode.
  • NML/FAST vacuum skid is back together and ready for operation.
  • G-2 expansion engine has been tuned up and is running well.
  • HAB plant is running well.
EE Support
  • Taking advantage of today's access to do a short list of inspections and address some minor issues.
Mechanical & Fluids
  • Addressed problems with a tripped KRF skid temperature controller.
  • Looking for a leak at MI62.
  • Investigating cause of tripped LCW pump at NS2.
  • Had to defer several jobs planned for today's down period.
RF
  • MIRF 4 and 10 water leak repairs are in progress. (Update: Current estimate for completion is noon.)
FESS
  • MINOS sumps are both pumping well. Chlorination treatment is showing good results.
  • CUB cleanup is progressing well.
  • Preparing for Wilson Hall power outage tomorrow.
  • CUB LCW pump motor #6 was replaced.
There are minutes attached to this event. Show them.
    • 09:00 09:03
      Crew Chief 3m One West

      One West

      Wilson Hall

    • 09:03 09:06
      Operations Coordinator 3m One West

      One West

      Wilson Hall

      Slides
    • 09:06 09:09
      Linac 3m One West

      One West

      Wilson Hall

      Running OK.
      Had a problem with a water skid yesterday that they are looking at in detail this morning.
    • 09:09 09:12
      Booster 3m One West

      One West

      Wilson Hall

      Slides
      Good week overall.
      4.5E12 to NuMi.
      1E12 to SY.
      22 minutes of downtime for the week, mostly misc RF.
      Commissioning of the laser notcher continues on the $1D cycles and the system is working well.
      Early capture studies and cogging code updates continue.
      Requested studies before the shutdown are listed in the accompanying slides. Tan is studies coordinator.
    • 09:12 09:15
      Main Injector & Recycler 3m One West

      One West

      Wilson Hall

      Slides
      MI has had a smooth week.
      Currently in access to repair water leaks on two RF cavities.
      Ring wide rad survey is also being done this morning.
      Requested studies before the shutdown are listed in the accompanying slides.
    • 09:15 09:18
      NuMI 3m One West

      One West

      Wilson Hall

      Running well.
      Currently looking for a water leak in the MI stub.
    • 09:18 09:21
      NuMI Experiments 3m One West

      One West

      Wilson Hall

      Running well.
    • 09:21 09:23
      Booster Neutrino 2m One West

      One West

      Wilson Hall

      Cooling water is getting warm along with the weather.
    • 09:23 09:24
      BNB Experiments 1m One West

      One West

      Wilson Hall

      MicroBooNE has updated their trigger.
      Prepared for WH power outage this weekend.
    • 09:24 09:26
      Muon Rings 2m One West

      One West

      Wilson Hall

      Beam studies have been in progress.
      M1 TLM studies will continue this afternoon.
      Note that there is no access permitted to AP1.
      Ran 8GeV mode to delivery ring and worked on orbit smoothing.
      Plan to turn on in 3.1 GeV mode today.
    • 09:27 09:28
      Muon Experiments 1m One West

      One West

      Wilson Hall

      Speakers: Brendan Casey (FNAL), Brendan Kiburg (Fermilab), Joe Grange (Argonne National Lab)
      Hope to be ready for S&S this afternoon.
    • 09:28 09:30
      MTA 2m One West

      One West

      Wilson Hall

      Cleanup is underway. Access is restricted to the cleanup team.
    • 09:30 09:32
      SY120, Neutrino Muon, Meson Test, Meson Center 2m One West

      One West

      Wilson Hall

      Lost clock to the M05 ESS Thursday but that was recovered quickly.
      MCC5Q2 tripped.
    • 09:32 09:35
      SY120 Experiments 3m One West

      One West

      Wilson Hall

      SeaQuest is taking beam when it's available.
      LAriat is taking data.
      Mtest has ORC for Ice Cube experiment and will take data this week.
    • 09:35 09:38
      FAST 3m One West

      One West

      Wilson Hall

      FLuids group is investingating 300MeV line flow meter issues.
      3 50MeV quads are being skewed for flat beam transform operation.
      CC1 and CC2 RF stations are being brought on line.
      RF gun and CM2 stations  will be brought on when RSO locks have been removed.
    • 09:38 09:40
      PIP-II Injector Test 2m One West

      One West

      Wilson Hall

      Established beam through the LEBT and MEBT with high efficiencies.
      Checking out new instrumentation.
      Looking at getting permission to run at higher duty cycle.
      Plan  to shut down and install remaining quad triplets in mid-July.

    • 09:40 09:42
      Alignment 2m One West

      One West

      Wilson Hall

      Supported LCLS2 installation.
      Alignment support for Muon campus.
    • 09:42 09:45
      Controls 3m One West

      One West

      Wilson Hall

      Addressed problems with the FSEPS motion controls.
      Replaced Booster MADC #4.
    • 09:45 09:47
      Cryo 2m One West

      One West

      Wilson Hall

      MTA is running well at 4K.
      CMTF is running well and is in cooldown mode.
      NML/FAST vacuum skid is back together and ready for operation.
      G-2 expansion engine has been tuned up and is running well.
      HAB plant is running well.
    • 09:47 09:50
      ESH&Q 3m One West

      One West

      Wilson Hall

    • 09:50 09:52
      EE Support 2m One West

      One West

      Wilson Hall

      Taking advantage of today's access to do a short list of inspections and address some minor issues.
    • 09:52 09:54
      Instrumentation 2m One West

      One West

      Wilson Hall

    • 09:54 09:55
      Mechanical & Fluids 1m One West

      One West

      Wilson Hall

      Addressed problems with a tripped KRF skid temperature controller.
      Looking for a leak at MI62.
      Investigating cause of tripped LCW pump at NS2.
      Had to defer several jobs planned for today's down period.
    • 09:55 09:56
      RF 1m One West

      One West

      Wilson Hall

      MIRF 4 and 10 water leak repairs are in progress. (Update: Current estimate for completion is noon.)
    • 09:56 09:58
      FESS 2m One West

      One West

      Wilson Hall

      Speakers: Gilbert, Shirley, Sprosty
      MINOS sumps are both pumping well. Chlorination treatment is showing good results.
      CUB cleanup is progressing well.
      Preparing for Wilson Hall power outage tomorrow.
      CUB LCW pump motor #6 was replaced.
    • 09:58 09:59
      Summer Shutdown 2017 1m One West

      One West

      Wilson Hall

      Speaker: Mr Cons Gattuso (Fermi Lab)
    • 09:59 10:00
      Miscellaneous 1m One West

      One West

      Wilson Hall

      Slides