Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method has been removed. See news for more details.

Muon Department meeting

US/Central
Description
Stakeholders discuss the work and coordination needed for the various tasks of clear out and installation in and through the 30 straight section
Slides
    • 09:00 09:05
      Announcements 5m
      Speaker: Jerry Annala (AD/Tevatron)
      Slides
    • 09:05 09:15
      Use of database for start up checks 10m
      A new check system is being implemented by the Division to prevent start up mistakes. A new database will be an important part of this system. The Muon Campus will be the test case for this system.
      Speaker: Cons Gattuso (AD headquarters)
      Slides
    • 09:15 09:30
      M4 shield wall results 15m
      Speaker: Anthony Leveling (Fermilab)
    • 09:30 10:00
      Non Project efforts required 30m
      Speaker: Mr Brian Drendel (AD/HQ)
      Slides