Description
Review of the Cryomodule Stand for PIP-II Linac. Review material can be found in TeamCenter (TC# ED0008410). FRS (TC: ED0007996) TRS (TC: ED0007997) Zoom Information: https://fnal.zoom.us/my/fggarcia
Review Charge
Review Report Template
    • 1
      Introduction
      1. Team introduction and Organization 2. PIP-II Context 3. PIP2IT Context 4. Review Charge
      Speaker: Mr Curtis Baffes (Fermilab)
      Slides
    • 2
      Design Overview
      1. Requirements 2. Configuration 3. Construction
      Speaker: Jesse Batko
      Slides
    • 3
      Analysis
      1. Load Cases 2. Factor of Safety Summary
      Speaker: Jesse Batko
      Slides
    • 14:20
      Break
    • 4
      Table-top Review of Drawings and CAD model
      1. 2D Drawings available for investigation 2. 3D Model available for investigation
      Speaker: Scott Oplt (Fermilab)
      drawing - 25F000G
      drawing - F10107984
      drawings
      Slides
    • 5
      Installation Plan, ESHQ, Risk
      1. QA Plan 2. Requirement verification 3. Installation Plan 4. Risk analysis 5. Failure modes and effects analysis 6. Safety by Design implementation
      Speakers: Mr Curtis Baffes (Fermilab), Jesse Batko
      FMEA
      Quality Plan and RVM
      Risk Assesment
      Safety by Design Assesment
      Slides
    • 6
      Programmatic Aspects
      1. Schedule 2. Cost Estimation
      Speakers: Mr Curtis Baffes (Fermilab), Jesse Batko
      Slides
    • 7
      Closeout
      1. Summary Statement 2. Preliminary Findings 3. Preliminary Comments 4. Preliminary Recommendations