Review of the Cryomodule Stand for PIP-II Linac.
Review material can be found in TeamCenter (TC# ED0008410).
FRS (TC: ED0007996)
TRS (TC: ED0007997)
Zoom Information: https://fnal.zoom.us/my/fggarcia
Review Charge
Review Report Template
1
Introduction
1. Team introduction and Organization
2. PIP-II Context
3. PIP2IT Context
4. Review Charge
Speaker:
MrCurtis Baffes
(Fermilab)
Slides
2
Design Overview
1. Requirements
2. Configuration
3. Construction
Speaker:
Jesse Batko
Slides
3
Analysis
1. Load Cases
2. Factor of Safety Summary
Speaker:
Jesse Batko
Slides
14:20
Break
4
Table-top Review of Drawings and CAD model
1. 2D Drawings available for investigation
2. 3D Model available for investigation
Speaker:
Scott Oplt
(Fermilab)
drawing - 25F000G
drawing - F10107984
drawings
Slides
5
Installation Plan, ESHQ, Risk
1. QA Plan
2. Requirement verification
3. Installation Plan
4. Risk analysis
5. Failure modes and effects analysis
6. Safety by Design implementation