Please read these instructions before posting any event on Fermilab Indico

The FERMI(FNAL) network authorization method has been removed. See news for more details.

Crystal Collimation Workshop

US/Central
WH 1 East (Fermilab)

WH 1 East

Fermilab

  • Tuesday, 28 October
    • 1
      Bent Crystals in the LHC WH 1 East (Channeling 2008)

      WH 1 East

      Channeling 2008

      Erice, Italy
      Slides
    • 2
      Observation of High-Efficiency Axial Channeling of High-Energy Protons in a Bent Crystal WH 1 East (Channeling 2008)

      WH 1 East

      Channeling 2008

      Erice, Italy
      Slides
    • 3
      T-980: Studies in Tevatron WH 1 East

      WH 1 East

      Fermilab

      Slides
  • Wednesday, 29 October
    • 4
      Status of T980 WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 5
      T980 Recent Results WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 6
      T980 in 2009-2010 WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 7
      H4 Beam Test Results WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 8
      Simulations/Analysis for UA9 WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 10:20
      break WH 1 East

      WH 1 East

      Fermilab

    • 9
      Simulations for UA9 WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 10
      Synchro-betatron optics -- the grazing function g WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 11
      VR simulations with Application to an Electron Experiment WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 12
      Application to ILC WH 1 East

      WH 1 East

      Fermilab

      Slides
    • 13
      Discussion WH 1 East

      WH 1 East

      Fermilab