Purpose: Provide input to a comprehensive approach to storage space and temporary assembly space at Fermilab for the LBNFDUNE beamline and detectors. The lab’s property and logistics team has asked us to provide a single source for this information (they are also working on PIPII needs).
2 meetings:
1st to generally define the issue
2nd ~ 4 weeks later to come back with information and discuss what the needs are
Project teams outline at high level their anticipated space requirements for storage (including outside laydown) and assembly
Project teams outline at high level their anticipated space requirements for storage (including outside laydown) and assembly
Project teams outline at high level their anticipated space requirements for storage (including outside laydown) and assembly
Project teams outline at high level their anticipated space requirements for storage (including outside laydown) and assembly
Project teams outline at high level their anticipated space requirements for storage (including outside laydown) and assembly
AD: R White, P Czarapata, S Crowell
PPD: Rick Ford
APSTD: Gary Lorenz