Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.

Engineering review of the NEXT-100 experiment

US/Central
Black Hole (Fermilab)

Black Hole

Fermilab

  • Tuesday, 4 December
    • Overview
      • 1
        NEXT-100 general design and performance goals – JJ Gomez-Cadenas
      • 2
        Canfranc Laboratory infrastructure - Igor Liubarsky
        Slides
      • 3
        Budget, schedule cost – instant overview - Igor Liubarsky
        Slides
    • Mechanics
      • 4
        Mechanical Engineering aspects of NEXT100 - Derek Shuman
        Slides
    • 11:00
      Coffee break
    • Electronics
      • 5
        Tracking plane electronics – José F. Toledo Alarcón, Azriel Goldschmidt
        Slides
      • 6
        FNAL SiPM electronic concept – Paul Rubinov
        Slides
      • 7
        Energy plane electronics – José F. Toledo Alarcón, Azriel Goldschmidt
        Slides
      • 8
        Monitoring/slow control – Dave Nygren
    • 12:30
      Lunch
    • Other Subsystems
      • 9
        Calibrations - John Hauptman
        a. Calibration of tracking plane i. SiPM gain stability ii. SiPM sensitivity b. Calibration of energy plane i. Electronic stability/gain ii. Electroluminescent conversion stability iii. Conversion from ADC units to energy c. Discussion
      • 10
        Gas system - Igor Liubarsky
        a. Regular operation b. Flow pattern in detector c. Normal and emergency recovery d. Leak sensing and mitigation
        Slides
      • 11
        Radiopurity campaign & backgrounds – JJ Gomez-Cadenas
    • 15:00
      Coffee break
    • Integration,Environmental and safety issues
      • 12
        Sub-system and system electro-mechanical assembly in Canfranc – Igor Liubarsky, Derek Shuman
      • 13
        Environmental and safety issues
    • Discussion
      • 14
        Capture of unresolved issues
      • 15
        Cost issues - Igor Liubarsky
        a. Estimates of missing resources b. Contingency plans c. European and US contexts
        Slides
      • 16
        Schedule - JJ Gomez-Cadenas
      • 17
        FWP proposal – Dave Nygren
      • 18
        Can NEXT-100 run with molecular additives?
      • 19
        Priorities