Please read these instructions before posting any event on Fermilab Indico

Indico will be unavailable on Wed., Dec 18th from 7 - 7:30am due to server maintenance.

16–21 Sep 2024
Argonne National Laboratory
US/Central timezone

Update on the Target Station and Beamlines of MELODY (2024)

16 Sep 2024, 14:25
20m
B4100 (#401)

B4100

#401

Talk: remote WG3: Accelerator Physics Parallel: WG3

Speaker

Nikolaos Vassilopoulos (IHEP, Beijing)

Description

The Muon Station for Science, Technology, and Industry (MELODY) will be the first muon source at the China Spallation Neutron Source (CSNS) in China. In this presentation, we talk about the updated target station design including the target, shielding, proton beam dump and cooling. We also give details about our muon production target of copper, especially the AI optimization used for maximizing the surface muon production. Lastly, we summarize the design of the muon beamlines.

Working Group WG 3: Accelerator Physics

Primary author

Nikolaos Vassilopoulos (IHEP, Beijing)

Co-authors

Dr Liu Guangdong (IHEP/CSNS) Dr Liu Lei (USTC/CSNS) Dr Wu Chen (IHEP/CSNS) Dr Yu Bao (IHEP/CSNS)

Presentation materials