Please read these instructions before posting any event on Fermilab Indico

Indico will be down for maintenance on Thursday, May 16th from 6:00PM - 8:00PM CST.

Project X Collaboration Meeting

US/Central
1-West

1-West

Cryo WG Summary
Instrumentation WG Report
Linac WG Summary
MI WG Report
SRF Report
Transfer Line & Injection WG Report
  • Friday, 21 November
    • Opening Plenary Session 1-West

      1-West

      1-West

      • 1
        Project X Introduction, Strategy, and Collaboration Goals
        Speaker: Stephen Holmes (DO-DIRECTORATE)
        Opening Talk
      • 2
        Project X Initial Configuration Overview
        Speaker: Paul Derwent (AD/Recycler)
        Slides
    • 10:30
      Coffee Break
    • Beam Transfer Line/Recycler Working Group Snake Pit

      Snake Pit

      1-West

      • 3
        Present details of transfer line and injection ICD
        Convener: D. Raparia Goals: Present details of ICD and discuss any potenital modifications to ICD
        Speaker: D. Johnson
        Slides
      • 4
        Current Effort
        • a) Recycler Lattice
          Speaker: Dr Meiqin Xiao (AD/RR)
          Slides
        • b) Transverse phase space painting
          Speaker: L. Vorobiev/A. Drozhdin
          Slides
        • c) Laser stripping
          Speaker: B. Zwaska
          Slides
        • d) Injection absorber design
          Speaker: I. Rakhno/Z. Tang
          Slides
        • e) Footprint and Siting Issues
          Speaker: D. Johnson
          Slides
      • 5
        PS2 Injection: thoughts and concerns
        Speaker: B. Goddard, CERN
        Slides
      • 6
        Discussion of potential modifications to ICD
    • Instrumentation Working Group Curia II

      Curia II

      1-West

      • 7
        Overview of SNS Beam Instrumentation (Incl. Collaboration Aspects)
        Speaker: W. Blokland
        Slides
      • 8
        Discussion
      • 9
        HINS Beam Instrumentation R&D
        Speaker: Vic Scarpine (Fermilab)
        Slides
      • 10
        Discussion
      • 11
        A Personal View of Beam Instrumentation Collaborations
        Speaker: M. Wendt
        Slides
      • 12
        Discussion
    • Linac Working Group 1-West

      1-West

      1-West

      • 13
        Overview/Goals of Linac working group
        Speaker: S. Nagaitsev
        Slides
      • 14
        Beam physics, linac lattice
        Speaker: P. Ostroumov
        Slides
      • 15
        Issues with rf distirbution at the front end
        Speaker: R. Pasquinelli
      • 16
        Fermilab proposal for the PrX Linac RF distribution
        Speaker: O. Nezhevenko
        Slides
      • 17
        CERN interests/views
        Speaker: R. Garoby
        Slides
      • 18
        LLRF and other activities (LBNL)
        Speaker: L. Doolittle
        Slides
      • 19
        Discussion
    • Main Injector Working Group Comitium

      Comitium

      1-West

      • 20
        Review of MI Issues Comitium

        Comitium

        1-West

        Speaker: I. Kourbanis
        Slides
      • 21
        New rf system requirements/preliminary design Comitium

        Comitium

        1-West

        Speaker: J. Reid
        Slides
      • 22
        Experience with the RHIC yt-jump system Comitium

        Comitium

        1-West

        Speaker: T. Roser
        Slides
    • SRF Working Group Race Track (WH-7X)

      Race Track (WH-7X)

      1-West

      • 23
        Px Overview/Goals of working grp/elliptical cav.
        Speaker: R. Kephart
        Slides
      • 24
        FNAL program and ANL/FNAL infrastructure
        Speaker: S. Mishra
        Slides
      • 25
        MSU on Beta = 0.8 R&D so far, what is needed, and interests
        Speaker: R. York
        Slides
      • 26
        India interest in Spoke resonators
        Speaker: A. Roy
        Slides
      • 27
        India interest in beta = 0.8 CM and capabilities
        Speaker: V. Sahni
        Slides
      • 28
        Discussion
    • 12:30
      Lunch
    • Beam Transfer Line/Recycler Working Group Snake Pit

      Snake Pit

      1-West

      Convener: D. Raparia
      Goals: Present current RD&D program and identify issues to be addressed within the R&D program. Propose timeline RD&D plan components and sequencing.

      • 29
        Present current RD&D issues
        Speaker: D. Johnson
        Slides
      • 30
        Start discussion of RD&D issues to be addressed
      • 31
        Present initial draft of RD&D plan
        Speaker: D. Johnson
        Slides
      • 32
        Discussion of proposed RD&D timeline
    • Cryogenic Systems Working Group Black Hole

      Black Hole

      1-West

      • 33
        Project X Cryogenic System Overview
        Speaker: A. Klebaner, FNAL
        Slides
      • 34
        Potential Cryogenic Cycles
        Speaker: D. Arenius, TJLab
        Slides
      • 35
        Superconducting Accelerator Segmentation Overview
        Speaker: J. Theilacker, FNAL
        Slides
      • 36
        SRF Pressure Safety at Fermilab
        Speaker: T. Nicol, FNAL
        Slides
      • 37
        Discussions
    • Instrumentation Working Group Curia II

      Curia II

      1-West

      • 38
        Presentation of possible Project X Beam Instrumentation R&D projects
        Speaker: V. Scarpine/M. Wendt
        Slides
      • 39
        Discussions
    • Main Injector Working Group Comitium

      Comitium

      1-West

      • 40
        MI e-cloud measurements
        Speaker: B. Zwaska
        Poster
      • 41
        Review of MI e-cloud simulations
        Speaker: M. Furman
        Slides
      • 42
        MI Collimation experience
        Speaker: B. Brown
        Slides
    • SRF/Linac Working Group (Joint Session) 1-West

      1-West

      1-West

      • 43
        Linac lattice requirements on cryomodules
        Speaker: P. Ostroumov
        Slides
      • 44
        Intro to PrX front end/Low Beta Cavities
        Speaker: R. Webber
        Slides
      • 45
        ANL interests and capabilities (spokes + ellipticals)
        Speaker: M. Kelly
        Slides
      • 46
        PrX coupler requirements
        Speaker: N. Solyak/Yakovlev
        Slides
      • 47
        SLAC proposals for PrX (1.3) couplers
        Speaker: C. Adolphsen
        Slides
      • 48
        Cornell interests and capabilities
        Speaker: M. Tigner
        Slides
      • 49
        How to design/build top loaded cryostats
        Speaker: J. Fuerst, ANL
        Slides
      • 50
        Discussion
    • 15:30
      Coffee Break
    • Beam Transfer Line/Recycler Snake Pit

      Snake Pit

      1-West

      convener: D. Johnson
      Goals: Propose a provisional distribution of responsibility through CD-1. Identify any issues that need resolution

      • 51
        Discussion of any issues that need resolution
      • 52
        Discussion of a provisional distribution of responsibility
      • 53
        Other business/summary
    • Cryogenic Systems Working Group Black Hole

      Black Hole

      1-West

      • 54
        The 1.3 GHzCryomodule Heat Load
        Speaker: T. Peterson, FNAL
        Slides
      • 55
        NML Cryogenic System Overview
        Speaker: A. Martinez, FNAL
        Slides
      • 56
        HINS Solenoids Head Load
        Speaker: T. Page, FNAL
        Slides
    • Linac Working Group Curia II

      Curia II

      1-West

      • 57
        SLAC interest in Px RF equipment (dist, klystrons, modulators), RF R&D needed
        Speaker: C. Adolphsen
        Slides
      • 58
        PrX SC quads/solenoids
        Speaker: M. Tartaglia
        Slides
      • 59
        Final discussion/preparation of WG summary talk
    • Main Injector Working Group Comitium

      Comitium

      1-West

      • 60
        Propose a provisional distribution of responsibility through CD-1
    • SRF Working Group Race Track (WH-7X)

      Race Track (WH-7X)

      1-West

      • 61
        JLab interests and capabilities
        Speaker: A. Hutton
        Slides
      • 62
        Final discussion/preparation of WG summary talk
  • Saturday, 22 November
    • Working Group Reports (Files posted at top of page)
    • 10:00
      Coffee Break
    • Working Group Reports (Files posted at top of page)