Please read these instructions before posting any event on Fermilab Indico

Indico will be down for maintenance on Thursday, May 16th from 6:00PM - 8:00PM CST.

PDR Review for Beam Transfer Line for PIP-II (Lattice, Magnets, Power Supplies)

US/Central
1-East (Fermilab)

1-East

Fermilab

3-way septum design
3-way septum sketches
Beam Transfer Line PDR Review Report
BTL Dipole FRS
Dipole Preliminary Design
Dipole PS spread sheet
Dipole TRS
Interface Document
Large Aperture Quad Design
PIP-II Beam Transfer Line PDR Review Charge
Prevention by Design
Quad Design
Quad FRS
Quad PS Spread sheet
Quad TRS
Specialty Magnet FRS
Specialty Magnet TRS
Transfer_Line_Beam_Absorber_FRS
    • Introduction
      Convener: Dr Ioanis Kourbanis (Fermilab)
      slides
    • Beam Transfer Line Lattice
      Convener: Dr Meiqin Xiao (AD/RR)
      slides
    • 09:45
      Break
    • Magnets
      Convener: Mr Bruce Hanna (Fermi National Accelerator Lab)
      slides
    • Power Supplies
      Convener: Matt Kufer
      slides
    • 11:30
      Lunch
    • Review Committee Conference
    • Close-out