3x1x1 bi-weekly meeting
Thursday 2 Jun 2016, 14:00
→
16:00
Europe/Zurich
2-010 (182)
2-010
182
Description
internet connection:
remote Vidyo connection can be found
here
phone connection:
explained
here
use room extension: 1010644826
14:00
→
14:10
Detector assembly status and plans
10m
Speaker
:
Dr
Sebastien Murphy
(ETH Zurich)
Slides
14:10
→
14:20
Status of Demaco installation
10m
Speaker
:
Dr
Michel Chalifour
(CERN)
Slides
14:20
→
14:30
readiness for internal piping installation
10m
Speaker
:
Mr
Shuoxing Wu
(ETH Zurich)
Slides
14:30
→
14:40
first test of slow control and PVSS
10m
Speakers
:
Mr
Thierry VIANT
(ETH Zurich)
,
Mr
Yann-Axel Rigaut
(CERN)
Slides
14:40
→
14:50
plans for Front End electronics and noise test
10m
Speaker
:
Dario Autiero
(IPNL)
Slides
14:50
→
15:00
getting ready for final CRP cabling: status of Level-meters, pulser, etc..
10m
Speaker
:
Mr
Cosimo Cantini
(ETH)
Slides
15:00
→
15:10
Bath test: summary and results from signal continuity test
10m
Speakers
:
Mr
Cosimo Cantini
(ETH)
,
Dr
Laura Molina Bueno
(ETH Zurich)
Slides
15:10
→
15:20
status of high voltage feedthrough
10m
Speakers
:
Mr
Adamo Gendotti
(ETHZ)
,
Franco Sergiampietri
(CERN)
,
Dr
Laura Molina-Bueno
(ETH Zurich)
Slides
15:20
→
15:30
final CRP and drift cage layout before installation (camera fixation, cable trays,...)
10m
Speaker
:
Mr
Adamo Gendotti
(ETHZ)
Slides