Please read these instructions before posting any event on Fermilab Indico

Indico will be down for maintenance on Wednesday, July 17th from 7-7:30 am.

3x1x1 bi-weekly meeting

Europe/Zurich
2-010 (182)

2-010

182

Description
internet connection: remote Vidyo connection can be found here
phone connection: explained here use room extension: 1010644826
    • 14:00 14:10
      Detector assembly status and plans 10m
      Speaker: Dr Sebastien Murphy (ETH Zurich)
      Slides
    • 14:10 14:20
      Status of Demaco installation 10m
      Speaker: Dr Michel Chalifour (CERN)
      Slides
    • 14:20 14:30
      readiness for internal piping installation 10m
      Speaker: Mr Shuoxing Wu (ETH Zurich)
      Slides
    • 14:30 14:40
      first test of slow control and PVSS 10m
      Speakers: Mr Thierry VIANT (ETH Zurich), Mr Yann-Axel Rigaut (CERN)
      Slides
    • 14:40 14:50
      plans for Front End electronics and noise test 10m
      Speaker: Dario Autiero (IPNL)
      Slides
    • 14:50 15:00
      getting ready for final CRP cabling: status of Level-meters, pulser, etc.. 10m
      Speaker: Mr Cosimo Cantini (ETH)
      Slides
    • 15:00 15:10
      Bath test: summary and results from signal continuity test 10m
      Speakers: Mr Cosimo Cantini (ETH), Dr Laura Molina Bueno (ETH Zurich)
      Slides
    • 15:10 15:20
      status of high voltage feedthrough 10m
      Speakers: Mr Adamo Gendotti (ETHZ), Franco Sergiampietri (CERN), Dr Laura Molina-Bueno (ETH Zurich)
      Slides
    • 15:20 15:30
      final CRP and drift cage layout before installation (camera fixation, cable trays,...) 10m
      Speaker: Mr Adamo Gendotti (ETHZ)
      Slides