Building Infrastructure Electrical Systems (Cables and Racks) PDR
Monday 31 Aug 2020, 08:30
→
12:55
US/Central
Zoom
Zoom
01. Building Infrastructure FRS_RevA.pdf
02. Master Room Data Sheet.xlsx
03. Consolidated ICD Master 7-1-2020 Rev.H.xlsm
04. PIP2 BldgI Electrical Risk Assessment.xlsx
05. PtD Hazard Assessment - Electrical.pdf
06. Resource Loaded Schedule.pdf
07. Cable Scaling CMTS1 to PIP2.docx
08. Rack and Cable Tray.docx
09. PIP-II Cable Plant Pull and Documention Plan.docx
10. Cable Criteria.docx
11. PIP-II Standard Cable and Connectors.docx
12. Building Infrastructure Materials QC Plan.docx
Review Charge.docx
Review Report.docx
08:30
→
08:40
Introduction
08:30
Welcome & Logistics
5m
Speaker
:
Mr
Jonathan Hunt
(Fermilab)
08:35
PIP-II Review Guidance
5m
Speaker
:
Mr
Alex Martinez
(Fermilab)
PIP-II Review Introduction for Reviewers Building Infrastructure.pptx
08:40
→
09:10
Overview of Building Infrastructure L4 Electrical Systems
PIP-II Electrical Systems PDR - JH L4 Overview.pptx
08:40
Overview of Building Infrastructure L4 Electrical Systems
30m
Speaker
:
Mr
Jonathan Hunt
(Fermilab)
09:10
→
09:55
AC Power Distribution and Cable Plant Part 1
PDR Presentation 8_24_20.pptx
09:10
AC Power Distribution and Cable Plant Part 1
45m
Speaker
:
Mr
Ryan Crawford
(Fermilab)
09:55
→
10:10
Break
15m
10:10
→
10:55
Cable Plant Part 2 and Racks
10:10
Cable Plant Part 2 and Racks
45m
Speaker
:
Mr
Ryan Crawford
(Fermilab)
10:55
→
11:35
Questions/Discussions
11:35
→
11:45
Closeout
11:35
Closeout
10m
Speaker
:
Mr
Chris Jensen
(Fermilab)