Speaker
Description
Current machine concepts developed by Muon Accelerator Program (MAP) for a neutrino factory can be extended to reach the 63~GeV needed for s-channel production of the Higgs boson and beyond, by the addition of one or two RLAs, Envisioned staged approach, assumes a single-pass linac with a combination of 325 and 650 MHz superconducting RF, followed by a Recirculating Linear Accelerator(RLA) configured with 2.9~GeV/pass, 650 MHz superconducting linac based on quadrupole focusing, completed with four `droplet' arcs, where the beam reaches 15 GeV in 4.5 recirculation passes. The chain can be further extended by a subsequent RLA based on Tesla cavities.
.
Attendance type | In-person presentation |
---|