Fermilab, RRCAT, BARC Agenda

US/Central
INDIA, RRCAT, BARC

INDIA, RRCAT, BARC

    • Meeting with Dr. P.D. Gupta: Welcome and briefing about RRCAT
    • Visit to Accelerator Laboratories: System Leaders with other senior colleagues will accompany
      • 1
        Industrial-2 Complex
      • 2
        Solid State RF Amplifiers Lab
      • 3
        Accelerator Control Lab
      • 4
        SCRF Cavities and Infrastructure Building
      • 5
        Machining & Fabrication Facilities
      • 6
        VTS & Cryogenic Lab
      • 7
        Electron Linacs Lab
    • 13:15
      LUNCH
    • Discussion Sessions
    • Discussion Sessions
      • 10
        Status of HTS-2 design and production, plans for completion, expected ship date: Pradeep Kush & Prashant Khare
        Pradeep Kush & Prashant Khare
        Slides
      • 11
        SRF Infrastructure: Satish Joshi
        Questions: a) SRF Facility/Infrastructure development and commissioning at Labs in India, b) How much VTS testing has been done, including qualification using 1-cell cavities FNAL sent? How many tests can be done in one month?
        Slides
      • 12
        650 MHz RF power (Summary of RF power scope, progress and plans with deliverable dates): P. Hannurkar
        Slides
    • Discussion Session
      • 13
        Accelerator Controls: P. Fatnani
        Slides
      • 14
        Accelerator Physics Design: Vinit Kumar
    • 13:30
      LUNCH
    • Discussion on deliverables and summary with Director and System leaders
    • Interaction with prospective candidates for deputation to Fermilab
    • Center of Design and Manufacturing (Venue: CDM)
      • 15
        Status of CMTS parts, completion date, ship date: Anil Sinha
      • 16
        Details of Engineering and Manufacturing at CDM
        1) Design 2) Planning 3) Q&A 4) Test
        Slides
    • Tour of CDM
    • 13:30
      LUNCH
    • Project Status and R&D at Fermilab (by Fermilab Scientist)
      slides
    • 650 MHz LB Cavity (LB650 MHz, 1-cell cavity of the new design, date for completion: Sumit Som, VECC
      slides
    • SSR1 Cavity Development/Schedule: P.N. Prakash, IUAC
      slides
    • MEBT and HB650 Magnets, (Summary of magnets, scope, progress and plan with deliverable dates): Sanjay Malhotra
      slides
    • Interaction with prospective candidates for deputation to Fermilab
    • Discussion on Team Center with CD and FNAL, (C S R C Murthy and Don Mitchell
      Convener: Mr Donald Mitchell (Fermilab)
      slides
    • 325 MHz SSR2 Cavity and thoughts on Cryomodule, (Status of SSR2 cavity design, SSR2 cavity development/plans/schedule, what will be the roles of BARC, IUAC and VECC for SSR2 Cavity and Cryomodule: S. Krishnagopal (IADD), CDM & IUAC
      slides
    • RF Couplers and Tuners: Rajesh Kumar
      slides
    • 13:30
      LUNCH
    • RF Power
      • 17
        325 MHz RF Power (Summary of RF power scope, progress and plans with deliverable dates): Manjiri Pande
        Slides
    • RF Electronics: Gopal Joshi

      1) RF Protection System
      2) LLRF
      3) BPM

      slides
    • Accelerator Physics Design (1 GeV) SVLS Rao
      slides
    • Summary (Venue: TC Room, 7 Floor, Central Complex)
    • Tour of RF Electronics and Magnet
    • Tour of 325 MHz RF System
    • Meeting of Hasan Padamsee and Shekhar Mishra with prospective candidates for long term deputation to Fermilab at HBNI
      • 18
        Interaction with prospective candidates for deputation to Fermilab