Spring joint LARP/HiLumi-LHC Collaboration Meeting. This meeting will focus on status and plans for the LARP and HiLumi-LHC projects. This meeting will particularly emphasize the development of a formal project to produce US deliverables for the LHC luminisoty upgrade.
Beam Instrumentation LHC operational experience, developments and needs for HL-LHC
Beam-beam wire compensators, intra-bunch diagnostics, synchrotron light monitor etc.
Speaker:
Gianluigi Arduini
(CERN)
Slides
8
FLOAT
12:30 PM
Lunch
Interfaces between work packages
Convener:
DrOliver Bruning
(CERN)
9
HL-LHC overview from the AP point of view: baseline and latest emerging challenges
Speaker:
DrStephane Fartoukh
(CERN)
Slides
10
IR layout and main choices for the magnets
Speaker:
DrEzio Todesco
(CERN)
Slides
11
WP10: Energy Deposition and Radiation Damage in Triplet Magnets
Speaker:
DrNikolai Mokhov
(Fermilab)
Slides
12
Presentation on RF upgrade work [higher harmonic RF, Crab Cavity field quality]
Speaker:
DrErk JENSEN
(CERN)
Slides
3:30 PM
Coffee
Accelerator Session A
13
General Collimation presentation with topics: e-Lens for Halo removal (no FNAL hardware and no SPS test), alternative options for Halo removal, Crystal, LHC quench test, announcement of collimation review
Speaker:
DrStefano Redaelli Redaelli
(CERN)
Slides
14
Halo Diffusion Model &Effectiveness of Hollow Electron Beam Lens: A Sixtrack study
Speaker:
Drvalentina previtali
(CERN)
Slides
15
RHIC electron lens status and test plans and options at BNL
Speaker:
Wolfram Fischer
(BNL)
Slides
Magnet Systems A: Model magnet fabrication and test
Convener:
GianLuca Sabbi
(LBNL)
16
Fabrication and test results of the 11T magnet
Speaker:
Fred Nobrega
(FNAL)
Slides
17
Fabrication and test results of the HD3 magnet
Speaker:
DrMaxim MARCHEVSKY
(Lawrence Berkeley National Laboratory)
Slides
18
Progress on Fresca2/RMC design and fabrication
Speaker:
Ferracin Paolo
(CERN)
Slides
19
HQ02 assembly and next steps
Speaker:
Helene FELICE
(Lawrence Berkeley National Lab)
Slides
20
Results from mechanical model of the HQ alternate structure